Winter work list

We don't sit still in the winter, especially Toine. The list of jobs gets longer in the course of the winter and Toine spends a lot of hours on it in the weekends. With this time especially eye for the highly necessary maintenance jobs and for the eye beautiful results. 

 

Like:

  • polishing white polyester parts and also the blue band. That was very necessary and it looks nice shiny again
  • hole in Eline's room in the front (accidentally drilled when installing the central heating) closed so that no more rays of light come through from the bathroom.
  • mirror on the closet door in the girls' bathroom
  • new mirror in our bathroom (old one had a rusted edge)
  • steering wheel cross stitching re-sewn (Mira)
  • replaced the outhaul's block (had a large tear in it)
  • gasbun gets a new switch and also a bypass in case the security connector on it would break.
  • fixing bracket fixed on the boom with a plate on the inside of the boom
  • Replace oil and filter of hydraulic lowering device and backstay tensioner
  • the central heating radiator in the girls' bathroom is now really leakproof with horsehair
  • replace buttons of the anchor winch with new buttons that will not rust
  • fan in the back of our bathroom so that we can ventilate in cold days or rain without having to open the window.
  • painting cockpit platforms next to the entrance (is a lot of work and a huge improvement), see Card tables tub like new again
  • replaced the 7 air hoses with the new system that Rassy has been using on the new boats for a couple of years, see New ventilation grilles